400-658-1321

Jingyuan News

Location: Home/ Jingyuan Plastic Industry/ News/ News
Which buried pipelines need to be coated with hot asphalt

As long as the pipeline is buried underground, it is required to carry out anti-corrosion treatment in accordance with the specifications. The minimum standard is to apply asphalt for anti-corrosion, and generally, 2 felt and 3 oil or 3 felt and 4 oil treatment is also required.